Lifelong Leadership : Woven Together Through Mentoring Communities
$22.48
What helps leaders break through to new levels of impact? What sustains leaders in the unrelenting work of Christian ministry? What guides leaders through difficult transitions and perplexing challenges?
While many leadership books focus on the individual, Lifelong Leadership offers a comprehensive Mentoring Community model to support and develop Christian leaders, extending the work of God in and through ministry. This model was inspired by Leighton Ford as a way to inspire and support young leaders. MaryKate Morse is the inheritor of this leadership legacy. Her team has developed the Mentoring Community model, which is easy to replicate in a variety of settings.
Lifelong Leadership has been field-tested throughout the world by leaders of various ages, contexts, and experiences and includes testimonials about the enduring impact of this collaborative approach to leadership development. If you’re looking for a successful leadership model in which people trust one another and share each other’s burdens, commit to personal growth over time, and integrate the abiding presence of God, you’ll want to implement Lifelong Leadership with your team.
in stock within 3-5 days of online purchase
SKU (ISBN): 9781641580175
ISBN10: 1641580178
MaryKate Morse
Binding: Trade Paper
Published: May 2020
Publisher: NavPress
Print On Demand Product
Related products
-
Power Of Preaching
$14.99The No-Nonsense Preaching Manual Every Pastor Needs
The first book in the Kingdom Pastor’s Library from Tony Evans, The Power of Preaching will help you be faithful to the Word of God and preach with power and conviction. From the practice of preparation to learning to choose subjects wisely, this book offers brings you a preaching education from one of the most trusted and effective voices in ministry. It also includes important lessons on:
*Bible study methods & expository preaching
*The development and use of illustrations
*The cadence of deliveryLearn the essentials of preaching a powerful message from the gifted, veteran pastor, Tony Evans.
The Kingdom Pastor’s Library is a series of books that brings you a concise, complete pastoral philosophy and training from Tony Evans.
Faithful. Powerful. Practical. Become a Kingdom Pastor today.
Add to cartIn stock
-
Life Lessons From Matthew (Student/Study Guide)
$12.99The Max Lucado Life Lessons series continues to be one of the bestselling study guide series on the market today. This updated edition of the popular New Testament and Old Testament series will offer readers a complete selection of studies by Max Lucado. Intriguing questions, inspirational storytelling, and profound reflections will bring God’s Word to life for both individuals and small-group members. Each session now includes a key passage of Scripture from both the NIV (formerly NCV) and the NKJV, and the guides have been updated to include content from Max’s recent releases (2007-2016).
Add to cartin stock within 3-5 days of online purchase
-
Our Love Is Here To Stay
$21.99Marriage is full of changing seasons-some bright with promise, others more challenging. Strong marriages require daily maintenance-and a strong, mutual commitment to the God who enables us to love and persevere.
Designed to help you pray and consider God’s Word together, each devotion offers practical, biblically grounded advice that will encourage you to deepen your relationship with God and draw closer to each other.
“It is our hope that God will use these daily devotions to help you enhance the spiritual, emotional, and personal development of your marriage relationship. Then you, too, will be able to look with confidence into the future and say, ‘Our Love Is Here to Stay!'”
Add to cartOnly 1 left in stock (additional units can be purchased)
-
Kingdom Heroes : Building A Strong Faith That Endures
$18.40Are you living by faith?
Daily, each of us must choose between giving in to the world’s pressure to trust in ourselves, or yielding to God’s desire for us to hand control over our lives to Him. While following God’s directions when you don’t see immediate results can be difficult, the payoff will always be tremendous.
Join Dr. Tony Evans as he looks at those who are in the Bible’s Hall of Faith–Old Testament heroes such as Abraham, Noah, and Rahab, who let God lead their lives–and how their journeys can help you understand what it means to walk in faith. In Kingdom Heroes, you will discover how you can…
*commit to giving God your very best in everyday life
*use trials as opportunities to strengthen your faith
*leave a strong spiritual foundation for the generations that follow youAre you ready to leave the world behind and follow Him? Kingdom Heroes will motivate you to stop relying on your own strength and experience God’s unlimited power in your life.
Add to cartIn stock
Reviews
There are no reviews yet.